This weeks bonus challenge is Local Shop: visit your favorite small business near home or the office. Make sure to take and submit your photo to receive the extra steps!
While removing the decaying floor at the Hyannis Public Library, we uncovered a well! This space likely used to be the kitchen when the original library building was still a residence.
STAND Corp did an incredible job clearing the snow and kept the project on schedule, and starting with steel erection last week. Steel will be complete by the end of this week, followed by slabs on the second then first floors, then the elevator shaft. After that the wood framing for the next four floors will go up FAST.
This weeks bonus challenge is Local Shop: visit your favorite small business near home or the office. Make sure to take and submit your photo to receive the extra steps!
The next RIMiAD Meetup is just around the corner. Join us on Thursday, March 26th at Bistro Locale on 600 George Washington Hwy, Lincoln, RI 02865 at 6:00pm to 8:00pm. We are excited to host our northern RI event can’t wait to share some great apps and drinks with everyone.
Spring Rock Village (Millstone Road) is getting some press as the project just closed and breaks ground imminently. The 100% affordable project consists of 45 units in six buildings and is located in Brewster, MA, on Cape Cod.